‹ Jobs
New job
Fill this in at the site. Your answers decide which photos and labels are needed.
Site address
Site location
From your phone, while you're at the house. Photos are checked against it.
Use my location (I'm at the site)
Test date on the electrical certificate of compliance
The install date. The completion selfie must be on this date.
The job started on an earlier day
Battery brand
Battery model
Is the battery made of separate modules?
For example a stack of modules under one listed model.
Yes
No
Battery serial number, as listed in the REC Registry
Used to check the serial in your photo matches.
Was there solar at the site already?
Yes
No
Are you installing new solar panels on this job too?
Yes
No
Did you install a new inverter?
Yes
No
Is the system set up to give backup power?
Backup, standalone or alternative supply circuits.
Yes
No
Where does the inverter connect?
Distribution board
Main switchboard
Is the inverter next to the switchboard it connects to?
If not, you'll need a separate photo of the shutdown procedure at the inverter.
Yes
No
Switchboards with battery labels
Count each switchboard, including the inside cover of the meter box, that has critical labels. One photo each.
1
2
3
4
5
6
Create job and see the photo list