Rules and sources
Rules version 2026.11.16-3, built only from these CER documents, read 2026-11-15:
- PG: Solar battery photo guide: evidence requirements for solar battery installations, Version 1.2, June 2026
- IC: Solar battery inspection checklist, Version 1.2, July 2026 (states it is current as of 21 January 2026)
- IO: Installer obligations under the Small-scale Renewable Energy Scheme, Dated 5 December 2025
- BIP: Solar battery installers and designers (web page), Last updated 31 July 2026
This is a pre-check, not an approval. The Clean Energy Regulator (CER) makes the final decision on every claim, and you remain responsible for the installation and the evidence you submit.
Data checks (done in code)
P-ONSITE-PHASES On-site selfies at job setup, mid-installation and testing and commissioning
"geotagged and timestamped photos (`selfies') at each phase of installation, including: job setup, mid-installation, testing and commissioning"
PG, Existing installer on-site verification photo requirements, p. 10. Read 2026-11-15.
"We may fail an STC claim if your evidence doesn't show the 3 stages of installation."
BIP, Installer on-site verification photos
P-SERIAL-BATTERY Photo of the battery serial number(s)
"photos of the main battery unit must also be taken if the solar battery contains individual battery modules within a CEC listed model."
PG, Existing installer on-site verification photo requirements, p. 10. Read 2026-11-15.
"Where the battery contains individual battery modules within a CEC listed model, please provide photos of the main battery unit as well as the individual modules that make up the unit."
BIP, Installer on-site verification photos
P-SERIAL-INVERTER Photo of the inverter serial number, if the inverter is new
"the serial numbers on each solar battery and inverter (if new) match the listed numbers in the REC Registry"
PG, Existing installer on-site verification photo requirements, p. 10. Read 2026-11-15.
P-METER-BOX Photo of the critical labels on or around the meter box
"Installers must take a photo of the critical labels typically located on or around the meter box."
PG, Labels located on, or visible when approaching, the meter box, p. 4. Read 2026-11-15.
"outside of the meter box(es) including all critical labelling"
BIP, Critical labelling photo requirements
P-SWITCHBOARD Photo of each switchboard and inside cover with critical labelling
"If there is more than one switchboard, a photo must be taken of each switchboard and inside cover of meter box where critical labelling is located."
PG, Labels on and around the switchboard, p. 5. Read 2026-11-15.
P-SHUTDOWN-AT-PCE Separate photo of the shutdown procedure when the inverter is away from the switchboard
"where the PCE is located away from the switchboard, a separate photo of the emergency shutdown procedure must be supplied"
PG, Labels on and around the switchboard, p. 6. Read 2026-11-15.
P-BATTERY Photo of the front and sides of the battery with warning signs
"Installers must take a photo of the front and sides of the solar battery including all relevant warning signs installed in a compliant position appropriate to the battery and chemistry type."
PG, Solar battery front and sides, p. 8. Read 2026-11-15.
F-FORMAT Photo is a JPEG, PNG or HEIC file
"Photos can be provided in one of the following formats: JPEG, PNG, HEIC. ... Photos provided in PDF format won't be accepted."
PG, Photo file format, p. 9. Read 2026-11-15.
F-TIMESTAMP Photo has a capture time in its metadata
"Photos must be geotagged and timestamped"
PG, Photo file format, p. 9. Read 2026-11-15.
"Photos embedded in a document aren't suitable as they don't have the required metadata."
PG, Photo file format, p. 10
F-GEOTAG Photo has a location (geotag) in its metadata
"Photos must be geotagged and timestamped"
PG, Photo file format, p. 9. Read 2026-11-15.
F-ON-SITE Photo location is at the site derived
"All accredited installers and registered agents are required to collect on-site evidence as part of their compliance paperwork."
PG, Solar battery photo guide, p. 3. Read 2026-11-15.
How it's applied: The documents require on-site evidence and geotagged photos but give no distance. The app compares the photo's location with the site location recorded when the job was created. The distance limit is a product setting (MAX_DISTANCE_M), not a CER figure.
F-MATCH-ONSITE Label and serial photo metadata matches the on-site selfies unclear
"Photos must be geotagged and timestamped, and the metadata must match the existing installer on-site verification photos taken at each phase of installation."
PG, Photo file format, p. 9. Read 2026-11-15.
Unclear: The guide says the metadata 'must match' the on-site verification photos but does not say what counts as a match. The app treats it as: the same place (within the distance setting of the on-site selfies) and inside the job's time window.
F-JOB-DATES Every photo was taken between the job start date and the test date
"The evidence metadata needs to match the installation time from start to finish."
BIP, Installer on-site verification photos. Read 2026-11-15.
F-COMPLETION-DATE Completion selfie is on the test date of the electrical certificate of compliance
"a final ‘completion’ photo that matches the test date on the electrical certificate of compliance (or equivalent)."
BIP, Installer on-site verification photos. Read 2026-11-15.
"the final `completion' photo should match the test date on the electrical certificate of compliance (or equivalent)"
PG, Existing installer on-site verification photo requirements, p. 10
F-PHASE-ORDER On-site selfies are in order: setup, then mid-installation, then completion derived
"geotagged and timestamped photos (`selfies') at each phase of installation, including: job setup, mid-installation, testing and commissioning"
PG, Existing installer on-site verification photo requirements, p. 10. Read 2026-11-15.
How it's applied: The documents name the phases in this order. A setup photo taken after the completion photo cannot show job setup.
F-NO-RETURN No photos taken after the job ended derived
"You are not allowed to return to the site after installation to take photos or falsify documents to match photos taken after installation."
BIP, Installer on-site verification photos. Read 2026-11-15.
How it's applied: The page forbids returning to site to take photos. The app flags any photo taken more than the grace period (WINDOW_GRACE_MIN setting, not a CER figure) before the setup selfie or after the completion selfie.
F-SHARP Photo is sharp enough to read derived
"You must take clear, geotagged and timestamped photographs of critical labelling and signage for each solar battery installation."
BIP, Critical labelling photo requirements. Read 2026-11-15.
How it's applied: The documents require 'clear' photos with legible labels but set no measure. The app uses a blur score threshold (MIN_SHARPNESS setting).
F-BRIGHT Photo is bright enough to read and not washed out derived
"Photos should clearly show: labels with legible text"
PG, Labels located on, or visible when approaching, the meter box (Figure 1 disclaimer), p. 5. Read 2026-11-15.
How it's applied: As F-SHARP: 'clear' photos with legible text. The app uses brightness limits (MIN_BRIGHTNESS and MAX_BRIGHTNESS settings).
F-NOT-DUPLICATE The same photo is not used twice derived
"As of 1 March 2026, all installers must take clear, geotagged and timestamped photos of critical labelling for every solar battery installation."
PG, Solar battery photo guide, p. 3. Read 2026-11-15.
How it's applied: Each required photo is a separate photo, and every installation needs its own on-site evidence. One image used for two required photos, or taken from another job, leaves a requirement unmet.
Picture checks (done by a vision model)
J-ONSITE-INSTALLER On-site selfie shows the installer at the site
"This is in addition to existing installer on-site verification photos which includes photo evidence of the installer being present during the main stages of installation."
PG, Solar battery photo guide, p. 3. Read 2026-11-15.
J-ONSITE-STAGE On-site selfie shows the right stage of the job unclear
"geotagged and time-stamped photos (‘selfies’) at each phase of installation, including: job setup, mid-installation, testing and commissioning"
BIP, Installer on-site verification photos. Read 2026-11-15.
Unclear: The documents name the stages (job setup, mid-installation, testing and commissioning) but do not say what must be visible behind the installer at each stage.
J-SUBJECT Photo shows what it is meant to show
"We require a photo of the: outside of the meter box(es) including all critical labelling; switchboard(s) and inside cover(s) including all critical labelling and shutdown procedures; front and sides of the solar battery showing all critical labelling."
BIP, Critical labelling photo requirements. Read 2026-11-15.
J-SERIAL-LEGIBLE Serial number can be read
"geotagged and time-stamped photos showing that the serial numbers on each solar battery and inverter (if new) match the listed numbers in the REC Registry"
PG, Existing installer on-site verification photo requirements, p. 10. Read 2026-11-15.
J-SERIAL-MATCH-BATTERY Battery serial number(s) in the photos match the ones entered for the REC Registry
"the serial numbers on each solar battery and inverter (if new) match the listed numbers in the REC Registry"
PG, Existing installer on-site verification photo requirements, p. 10. Read 2026-11-15.
J-SERIAL-MATCH-INVERTER Inverter serial number in the photo matches the one entered for the REC Registry
"the serial numbers on each solar battery and inverter (if new) match the listed numbers in the REC Registry"
PG, Existing installer on-site verification photo requirements, p. 10. Read 2026-11-15.
J-ES-LABEL Circular green reflective 'ES' label on or near the meter box
"the circular, green reflective label with the letter "ES" which provides vital information to emergency workers."
PG, Labels located on, or visible when approaching, the meter box, p. 4. Read 2026-11-15.
"Is signage, consisting of circular, green reflector, with the letters "ES", installed immediately on or adjacent to the meter box and switchboard, and is it readily available to be seen by approaching emergency workers?"
IC, Labelling, SB & Labelling 1, p. 6
J-ES-UN-NUMBER ES label shows the UN number for the battery chemistry below the lettering
"include the United Nations number for the primary chemistry of the battery system installed below the lettering – for example, UN3480 representing a Lithium Iron Phosphate or LiFePO4 Battery system"
PG, Labels located on, or visible when approaching, the meter box, p. 4. Read 2026-11-15.
"Is the ES sign at least 100mm in diameter and does it contain the United Nations number for the primary chemistry written below the "ES" lettering – for example, UN3480?"
IC, Labelling, SB & Labelling 2, p. 6
J-ES-SIZE ES label is at least 100 mm in diameter
"be at least 100mm in diameter"
PG, Labels located on, or visible when approaching, the meter box, p. 4. Read 2026-11-15.
J-LABELS-LEGIBLE Labels in the photo have legible text
"Photos should clearly show: labels with legible text"
PG, Figure 1, 2 and 3 disclaimers, p. 5. Read 2026-11-15.
J-LABELS-LOCATION Labels appear to be in a compliant location unclear
"Photos should clearly show: labels with legible text; labels are placed in a compliant location."
PG, Figure 1, 2 and 3 disclaimers, p. 5. Read 2026-11-15.
Unclear: The guide asks photos to show labels 'placed in a compliant location', but what is compliant comes from Australian standards that are outside these documents. The app gives an opinion only and never fails this check.
J-SHUTDOWN-AT-SWITCHBOARD Emergency shutdown procedure is shown at the switchboard
"the emergency shutdown procedure label – includes label placed adjacent to, and visible from, the equipment to be operated in the event of a shutdown – where the power conversion equipment (PCE) is adjacent to the switchboard it is directly connected to, the shutdown procedure may be placed within that switchboard"
PG, Labels on and around the switchboard, p. 5. Read 2026-11-15.
J-SHUTDOWN-AT-PCE Emergency shutdown procedure is shown at the inverter
"where the PCE is located away from the switchboard, a separate photo of the emergency shutdown procedure must be supplied"
PG, Labels on and around the switchboard, p. 6. Read 2026-11-15.
J-SHUTDOWN-CONTENT Shutdown procedure warns that isolating may not de-energise the battery
"The shutdown procedure shall also state that isolation of the battery system by isolation and shutting down the PCE may not de-energise the battery system and further action may be required."
IC, Labelling, Integrated BESS 14 / Preassembled BS 16, p. 8. Read 2026-11-15.
J-MULTIPLE-SUPPLIES 'Multiple supplies, isolate all supplies before working on this switchboard' label
"Do switchboards energised by the battery system contain the label "Multiple supplies, isolate all supplies before working on this switchboard”?"
IC, Labelling, SB & Labelling 17, p. 7. Read 2026-11-15.
"The SB & Labelling 16 and SB & Labelling 17 checklist items are the most common checklist items to be failed during an inspection and require rectification."
IC, Labelling, footnote 4, p. 7
"Installers can also refer to our solar battery inspection checklist for the labelling requirements that are assessed as part of our inspections program"
PG, Where to find information about labelling requirements, p. 4
J-MAIN-SWITCH-GRID Grid main switch labelled 'MAIN SWITCH (GRID)' (or 'MAIN ISOLATOR (GRID)' at a distribution board)
"If battery/inverter system is connected to the main switchboard, has the grid supply main switch been labelled "MAIN SWITCH (GRID)” or similar? Alternatively, if the battery/inverter system has been connected to a distribution board has a sign containing the words "MAIN ISOLATOR (GRID)” or similar been placed adjacent to the isolator for the normal supply to the distribution switchboard?"
IC, Labelling, SB & Labelling 6, p. 6. Read 2026-11-15.
J-MAIN-SWITCH-INVERTER Inverter supply labelled 'MAIN SWITCH (INVERTER)'
"Have supplementary supplies been labelled as “MAIN SWITCH (INVERTER)" at the switchboard to which they are directly connected?"
IC, Labelling, SB & Labelling 8, p. 7. Read 2026-11-15.
J-DISTRIBUTION-BOARD-WARNING Main switchboard warning when the inverter connects at a distribution board
"Where the inverter of the battery system is connected to a distribution board, is the following label present on the main switchboard and all intermediate distribution switchboards: “Warning Multiple Supplies Isolate Inverter Supply at Distribution Switchboard at …”?"
IC, Labelling, SB & Labelling 18, p. 7. Read 2026-11-15.
J-BACKUP-WARNING Backup systems: multiple mode inverter warning label
"a warning label placed on the switchboard or inside the meter box that clearly states "WARNING", "MULTIPLE MODE INVERTER CONNECTED" and "NEUTRAL AND EARTH CIRCUITS MAY BE LIVE UNDER NORMAL AND FAULT CONDITIONS" and reference to the shutdown procedure for safe isolation"
PG, Labels on and around the switchboard, p. 6. Read 2026-11-15.
"Has a warning label been installed at the main switchboard and all intermediate distribution boards to indicate a multimode inverter with alternative supply has been installed and to follow the shutdown procedure for safe isolation, and is the text "Neutral and earth circuits may be live under fault conditions" included on this sign?"
IC, Labelling, SB & Labelling 16, p. 7
Unclear: The two documents word this label differently. The photo guide says 'NEUTRAL AND EARTH CIRCUITS MAY BE LIVE UNDER NORMAL AND FAULT CONDITIONS'; the checklist says 'Neutral and earth circuits may be live under fault conditions'. The app accepts either.
J-BACKUP-MAIN-SWITCH Backup systems: alternative supply main switch labelled 'MAIN SWITCH (ALTERNATIVE)'
"labelling for Alternative Supply (commonly known as back-up or standalone) systems – includes the main switch back-up supply and any backed-up circuits with correct labelling"
PG, Labels on and around the switchboard, p. 6. Read 2026-11-15.
"Has the main switch for alternative supply from ... the battery system/inverter been labelled "MAIN SWITCH (ALTERNATIVE)"?"
IC, Labelling, SB & Labelling 28, p. 7
J-BACKUP-CIRCUITS Backup systems: backed-up circuits labelled and grouped with the backup main switch
"ensuring that the main switch for the back-up supply and backed-up circuits are grouped together."
PG, Labels on and around the switchboard, p. 6. Read 2026-11-15.
"Are circuits that are backed up when the grid is ... not available appropriately labelled to indicate their function?"
IC, Labelling, SB & Labelling 19, p. 7
"Are circuits that are backed up when the grid is not available grouped?"
IC, Isolation, SB & Labelling 27, p. 14
J-BATTERY-FRONT-SIDES Photos show the front and sides of the battery unclear
"Installers must take a photo of the front and sides of the solar battery"
PG, Solar battery front and sides, p. 8. Read 2026-11-15.
Unclear: The guide asks for 'a photo of the front and sides'. It doesn't say whether one angled photo is enough, or what to do when a side is against a wall.
J-BATTERY-SYSTEM-SIGN Battery system sign with short-circuit current and maximum DC voltage
"Is there a sign adjacent to the lithium-ion preassembled integrated BESS that states: a) Battery System or Battery Energy Storage System ... b) the correct short-circuit current (specifying current in amperes) c) the correct maximum DC voltage (specifying voltage in volts). For systems over DVC-A, the sign shall also state "Hazardous DC voltage"."
IC, Labelling, Integrated BESS 13 / Preassembled BS 15, p. 8. Read 2026-11-15.
J-SIGN-TOXIC-FUMES 'Danger, toxic fumes' sign at the battery
"Signs shall be mounted either adjacent to the enclosure or on all doors to the room where the battery system is located. Some of these signs may include: 'Danger, toxic fumes'"
PG, Solar battery front and sides, p. 8. Read 2026-11-15.
"Is the "Danger, toxic fumes" sign installed adjacent to the enclosure or on all doors to the room where the battery system is located detailing the specific fault conditions (for example fire) under which the fumes will be present?"
IC, Labelling, Integrated BESS 16 / Preassembled BS 20, p. 9
"If an installer determines that certain signage isn't required, such as when it's not appropriate to the battery or chemistry type, they must provide supporting documentation."
PG, Solar battery front and sides, p. 8
J-SIGN-EXPLOSION 'Danger, risk of battery explosion' sign, if the chemistry needs it
"`Danger, risk of battery explosion'"
PG, Solar battery front and sides, p. 8. Read 2026-11-15.
"If battery chemistry is categorised as a having a risk of battery explosion, has a "Danger, Risk of Battery Explosion" sign been installed in a prominent position approaching the battery system?"
IC, Labelling, Integrated BESS 15 / Preassembled BS 19, p. 9
J-SIGN-ARC-FLASH Arc flash hazard sign, if the chemistry needs it
"`Arc Flash Hazard'"
PG, Solar battery front and sides, p. 8. Read 2026-11-15.
"If the battery chemistry is categorised as having an arc flash hazard above "minor" (see AS/NZS 5139:2019 Clause 6.3.2.2, Table 6.1), is there a sign specifying the dangers of the arc flash?"
IC, Labelling, Integrated BESS 17 / Preassembled BS 21, p. 9
J-SIGN-HAZARDOUS-DC 'Hazardous D.C. Voltage' sign for systems above DVC-A
"`Hazardous D.C. Voltage' for systems above Decisive Voltage Class A (DVC-A)"
PG, Solar battery front and sides, p. 8. Read 2026-11-15.
J-SIGN-CHEMICAL-HAZARD Chemical hazard sign with first-aid instructions
"a chemical hazard sign giving instructions on what to do if the skin, eyes or other parts of the body are exposed to the battery chemicals"
PG, Solar battery front and sides, p. 8. Read 2026-11-15.
U-OTHER-RELEVANT-LABELS Other relevant labels required by Australian standards and state regulators unclear
"other relevant labels according to Australian standards and state and territory electrical safety regulations, such as a circular, green label with the letters "PV"."
PG, Labels located on, or visible when approaching, the meter box, p. 4. Read 2026-11-15.
Unclear: Each photo section ends with 'other relevant labels according to Australian standards and state and territory electrical safety regulations'. The documents don't list them, and the standards are outside the source set. The app lists the labels it can see but does not judge completeness.
Reminders (not checked)
I-NO-BACKUP-EVIDENCE No backup: written evidence needed
"For systems that are not configured to provide backup power, the installer must provide evidence of this in writing. The correspondence can be included as part of your compliance paperwork."
PG, Labels on and around the switchboard, p. 6. Read 2026-11-15.
I-SIGNAGE-EXEMPTION Signs not needed for this chemistry: documents needed
"If an installer determines that certain signage isn't required, such as when it's not appropriate to the battery or chemistry type, they must provide supporting documentation. This may include references to the safety data sheet (SDS) stating which specific signage isn't required."
PG, Solar battery front and sides, p. 8. Read 2026-11-15.
I-PV-SEPARATE Battery and solar PV installed together: separate on-site photos
"If installing a solar battery and solar PV at the same time, you must take separate on-site verification photos for each system."
BIP, Installer on-site verification photos. Read 2026-11-15.
I-EXPLAIN-DURATION Explain unusual job duration
"You need to explain if your installation took more or less time than expected under normal conditions."
BIP, Installer on-site verification photos. Read 2026-11-15.
I-KEEP-ORIGINALS Keep the original photo files for 5 years
"Photos must be kept on file for 5 years following the submission of a claim. They may be audited by us at any time, even after the claim has been approved."
PG, How to submit photos, p. 10. Read 2026-11-15.
I-SUBMIT-ORIGINALS Submit original photo files, one battery claim per email
"Photos must be supplied in the original photo file format. Photos embedded in a document aren't suitable as they don't have the required metadata. ... Make sure you send photos for only ONE battery claim per email."
PG, Photo file format; How to submit photos, p. 10. Read 2026-11-15.
Points the documents leave unclear
"testing and commissioning – the final `completion' photo should match the test date on the electrical certificate of compliance (or equivalent)" (PG p. 10)
"a final ‘completion’ photo that matches the test date on the electrical certificate of compliance (or equivalent)." (BIP)
"We may fail an STC claim if your evidence doesn't show the 3 stages of installation." (BIP)
What the app does: The guide makes the completion photo part of testing and commissioning, and the web page lists it as a separate bullet. The app requires three selfies and treats the testing and commissioning selfie as the completion photo.
"at each phase of installation, including:" (PG p. 10)
What the app does: 'Including' suggests the list may not be complete. The app requires the three named phases only.
"photos of the main battery unit must also be taken if the solar battery contains individual battery modules within a CEC listed model." (PG p. 10)
"please provide photos of the main battery unit as well as the individual modules that make up the unit." (BIP)
What the app does: The app asks for every serial (main unit and each module) and checks that each one appears in a photo.
"Labels may also be placed in other visible locations, provided they are visible on approach, on or near the meter box by emergency services." (PG p. 5)
"installed immediately on or adjacent to the meter box and switchboard" (IC p. 6)
What the app does: The app looks for the ES label in the meter box photos only.
Not checked by this app
- IC SB & Labelling 3: plan or drawing at the main switchboard showing where the battery is, when it isn't easily located. Depends on whether the battery is easy to find, which the app can't know. The photo guide doesn't ask for a photo of it.
- IC SB & Labelling 4: 'BESS 1 of 3' numbering when several battery systems are installed. This version assumes one battery system per job.
- IC SB & Labelling 5: hard-copy safety data sheet in a holder at the main switchboard or meter box. The photo guide doesn't ask for a photo of it.
- IC Preassembled BS 18: warning to turn off all energy sources when solar and battery share one inverter. The checklist doesn't say where the sign goes, so the app can't tell which photo should show it.
- IC Preassembled BS 98: DC battery cabling labelled 'BATTERY' every 2 m. The cabling isn't in any required photo.
- IC SB & Labelling 25 (durability, UV-stable materials, fixing, indelible). Can't be judged from a photo. Legibility and English wording are covered by J-LABELS-LEGIBLE.
- All non-labelling checklist items (isolation, mechanical protection, overcurrent, fire, restricted locations, wiring, documentation). These are inspection items, not photo evidence requirements in the photo guide.
- BIP: no more than 2 installations claimed per day. This applies across jobs, not to one job's photos.